TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 480 of 820
INSTALL PERSONNEL HEATER KIT (M113A3, M1059A3, AND M58 ONLY) — Continued 0072 00 15. Secure plenum (1) to heater (2) with four lockwashers (3) and screws (4). NOTE Four locknuts and screws were previously removed and retained. However, screw that secures ground strap is supplied in the personnel heater kit. For model A20, P/N 5000-30178 heaters, the ground strap is attached to the top of the heater. 16. Secure two saddles (5) to power plant bulkhead with four retained screws (6), three lockwashers (7), ground strap (8), and four retained locknuts (9). 17. Install two clamps (10) in two saddles (5). 18. Position clamp (11) on heater intake port (12) and clamp (13) on heater exhaust pipe (14). Do not tighten. 19. Install elbow (15) in heater intake pipe (12) and intake elbow (16). 20. Align inlet elbow (15) with intake elbow (16) and exhaust port (14) with exhaust pipe in carrier. Place heater (2) and shield (17) against saddles (5). 21. While still supporting heater, double check for proper mating of heater exhaust port (14) and exhaust pipe in carrier. Tighten saddle clamps (10). 22. Position ground strap (8) on heater (2). Secure with one lockwasher (18) and screw (19). Discard existing screw and use screw provided in kit. 23. Tighten clamp (13) on heater exhaust port (14) and exhaust pipe in carrier. 24. Tighten clamp (11) on heater intake pipe (12). 0072 00-6 Change 3 TM 9-2350-277-34