TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 478 of 820

INSTALL PERSONNEL HEATER KIT (M113A3, M1059A3, AND M58 ONLY) — Continued 0072 00 7. Install grommet (10) in power plant bulkhead. 8. Install exhaust pipe (11) in grommet (10). 9. Install exhaust pipe (12) on exhaust pipe (11). 10. Secure two exhaust pipes (12) and (13) and two gaskets (14) to power plant bulkhead with four screws (15) and retained locknuts (16). 0072 00-4 Change 3 TM 9-2350-277-34