TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 263 of 820

TM 9-2350-277-34 REPLACE FRONT MAIN WIRING HARNESS — Continued 0030 00 58. Install panel (5) with two mounts (13) on support (12). Secure with two screws (8) and new lockwashers (9). 59. Install panel (12) on two struts (13) and (14). Secure with two nuts (15), mounts (16), washers (17), and screws (18). FOLLOW-THROUGH STEPS 1. Connect battery ground strap (see your -20) 2. Close power plant front access door (see your -10) 3. Raise power plant access cover (see your -10) 4. Raise trim vane (see your -10) 5. Start engine (see your -10) 6. Check that master switch panel, instrument panel, distribution box, and lights work right (see your -10) 7. Stop engine (see your -10) 8. Turn MASTER SWITCH to OFF (see your -10) END OF TASK 0030 00-35/36 blank Change 1