TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 262 of 820
TM 9-2350-277-34 REPLACE FRONT MAIN WIRING HARNESS — Continued 0030 00 51. Connect circuit 452B lead (10) to bilge pump ON indicator light (11). 52. Connect circuit 452A lead (8) to bilge pump switch (9). 53. Connect connector (6) to light selector switch (7). 54. Connect circuits 24 (1), 23 (2), 22 (3), and 21 (4) leads to rear main wiring harness (5). 55. Install WAIT indicator (15) with lockwasher (16) in instrument panel (5) and secure with knurled nut (14) (glow plug system only). 56. Place instrument panel (5) on two struts. 57. Install ground lead (11), WAIT indicator ground lead (17) (glow plug system only), and new lockwasher (10) on upper support (12). 0030 00-34 Change 1