TM-9-2350-277-20-6 Unit Maintenance Manual Volume 6 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 267 of 722
TM 9-2350-277-20-6 REPLACE STE/ICE SHUNT (M113A3 AND M1059A3 ONLY) — Continued 0870 00 4. Install lead 770 (13), new lockwasher (14), and screw (15) on shunt (5). 5. Remove tape from battery lead (16) and install lead on shunt (5). Secure with two screws (17) and new lockwashers (18). 6. Install battery ground strap (19), new lockwasher (20), and screw (21) to shunt (5). FOLLOW-THROUGH STEPS 1. Connect battery ground strap (WP 0337 00). 2. Install shunt guard (WP 0868 00). 3. Close spall liners (see your -10). END OF TASK 0870 00-5/6 blank Change 2