TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 707 of 928
TM 9-2350-277-20-5 REPLACE M3 NBC HEATER CONTROL BOX (M1068A3 ONLY) — Continued 0793 00 INSTALLATION 1. Remove four screws (1), washers (2), and cover (3) from control box (4). 2. Install cable (5) and grommet (6) in control box (4). Position terminal of cable on circuit breaker (7) and secure with screw (8). 3. Install cover (3), four washers (2), and screws (1) on control box (4). 4. Install four screws (9), new lockwashers (10), washers (11), and control box (4) on bracket (12) on driver’s sponson. 5. Connect wiring harness (13) to control box (4). 6. Secure cable (5) to wiring harness (13) with new straps (18). 7. Install screw (14), new lockwasher (15), and cable (5) on bus bar (16) in distribution box (17). FOLLOW-THROUGH STEPS 1. Install master switch panel (WP 0261 00). 2. Connect battery ground lead (WP 0338 00). END OF TASK 0793 00-3/4 blank