TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 543 of 928
TM 9-2350-277-20-5 REPLACE FOG OIL PUMP ELECTRICAL CABLE ASSEMBLY — Continued 0759 00 INSTALLATION 1. Align cable assembly (1) on hull with clamps (2)(3) and three clamps (4). Secure with new lockwashers (5) and screws (6). 2. Connect cable assembly (1) to control panel assembly connector 1J5 (8). 3. Connect cable assembly (1) to fog oil pump cable assembly (7). FOLLOW-THROUGH STEPS 1. Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00). 2. Set circuit breaker CB1 to ON (TM 3-1040-283-10). END OF TASK 0759 00-3/4 blank