TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 482 of 928
66. Attach pad (1), support (2) and left rear armor plate (3) to ramp (4) with two screws (5) and washers (6). 67. Install three screws (7) and washers (8) through armor plate (3) to ramp (4). 68. Attach lifting device to ramp door armor plate (9). Install armor plate (9) to ramp door (10) with screw (11) and two washers (12) at upper left corner and five screws (13) and washers (14) in remaining holes. Remove lifting device. 69. Attach lifting device to right rear armor plate (15). Install pad (16), right armor plate (15) and support (17) to ramp (4) with two screws (18) and washers (19). 70. Install eight screws (20) and washers (21) through armor plate (15) to ramp (4). Remove lifting device. TM 9-2350-277-20-5 INSTALL ARMOR KIT (M113A3 ONLY) — Continued 0748 00 FOLLOW-THROUGH STEPS 1. Install track cover (WP 0438 00). 2. Install smoke grenade launchers (WP 0455 00). END OF TASK 0748 00-14 Change 3