TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 40 of 928

TM 9-2350-277-20-5 REPLACE FRONT BILGE PUMP AND STRAINER — Continued 0632 00 9. Install strainer (18) on hull weldnuts. 10. Connect lead (19) to bilge pump (6). 11. Secure strainer (18) to hull weldnuts with two washers (20), new star washers (21), and screws (22). FOLLOW-THROUGH STEPS 1. Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00). 2. Install power plant front access cover (WP 0449 00). 3. Raise trim vane (see your -10). END OF TASK 0632 00-4