TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 399 of 928
TM 9-2350-277-20-5 REPLACE IGNITER 0730 00 THIS WORK PACKAGE COVERS: Removal (page 0730 00-1). Inspection (page 0730 00-2). Installation (page 0730 00-2). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0926 00, Item 65) M a t e r i a l s / P a r t s Gasket Lockwasher P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) Trim vane lowered (see your -10) Power plant access door open (see your -10) Battery ground strap disconnected (WP 0337 00), (WP 0338 00), or (WP 0339 00) Air cleaner removed (WP 0168 00) REMOVAL 1. Loosen four nuts (1). Turn cover plate (2) to the left and remove. 2. Remove screw (3), lockwasher (4), igniter ground lead (5), and ground strap (6) from coolant heater. Discard lockwasher. 3. Remove two nuts (7) and resistor strap (8) from igniter (9). Bend strap out of way. 4. Remove igniter (9) and gasket (10) from heater. Discard gasket. 0730 00-1