TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 290 of 928

TM 9-2350-277-20-5 REPAIR PERSONNEL HEATER CONTROL BOX — Continued 0702 00 4. Install indicator light assembly (1) in control box (2). a. Install light assembly (1) in control box (2). Secure with lockwasher (3) and nut (4). b. Install bulb (5) and cap (6) in light assembly (1). c. Install lead19-2 (7) on RUN-OFF-START switch (8). Secure with lockwasher (9) and screw (10). d. Install lead 17-3 (11) on circuit breaker (12). Secure with lockwasher (13) and screw (14). e. Install ground lead (15) on circuit breaker (12) mounting screw (16). Secure with new lockwasher (17) and nut (18). 0702 00-8