TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 287 of 928
TM 9-2350-277-20-5 REPAIR PERSONNEL HEATER CONTROL BOX — Continued 0702 00 ASSEMBLY NOTE Before connecting electrical leads, check tags and wiring diagram below to verify proper connection. NOTE Make sure key in receptacle is at the top. 1. Install receptacle (13) in control box (14). a. Install receptacle (13) in control box (14). Secure with four new lockwashers (12) and screws (11). b. Install lead 17-D (9) on circuit breaker (10). Secure with lockwasher (8) and screw (7). c. Install lead 12-B (17) on HI-LO switch (18). Secure with lockwasher (16) and screw (15). d. Install lead 19-E (5), lead 20-C (4), and lead 14-A (3) on RUN-OFF-START switch (6). Secure with three lockwashers (2) and screws (1). 0702 00-5