TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 230 of 928

TM 9-2350-277-20-5 REPLACE BULKHEAD CONNECTION TO PERSONNEL HEATER TUBE (M577A3 AND M1068A3 ONLY) — Continued 0687 00 FOLLOW-THROUGH STEPS 1. Open heater fuel shutoff valve (see your -10). 2. Connect battery ground lead (WP 0338 00). 3. Bleed fuel line (WP 0679 00). 4. Start heater (see your -10). Check all fittings for leaks. Turn heater off. 5. Install power plant rear access panel (WP 0439 00). 6. Install right front floor plate (WP 0539 00) or (WP 0544 00). 7. Install heater duct (WP 0706 00). 8. Start engine (see your -10). 9. Raise and lock ramp (see your -10). 10. Stop engine (see your -10). END OF TASK 0687 00-4