TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 165 of 928
TM 9-2350-277-20-5 INSPECT POWER PLANT SLING 0673 00 THIS WORK PACKAGE COVERS: Periodic Check (page 0673 00-2). Preoperative Check (page 0673 00-8). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0926 00, Item 65) Drill Set (WP 0926 00, Item 18) Measuring Tape (WP 0926 00, Item 58) Suitable Lifting Device P e r s o n n e l R e q u i r e d Unit Mechanic E q u i p m e n t C o n d i t i o n Sling suspended from suitable lifting device 0673 00-1