TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 129 of 928
TM 9-2350-277-20-5 REPLACE TUBE FROM RAMP CONTROL VALVE TO BULKHEAD — Continued 0664 00 INSTALLATION 1. Install nipple (1) in bulkhead and secure with jam nut (2). 2. Connect hose (3) to nipple (1). 3. Place three clamps (4) on tube (5). 4. Install tube (5) on tee or elbow (6) of ramp control valve (7). 5. Align three clamps (4) with power plant compartment holes. 6. Secure with three screws (8), washers (9), and new locknuts (10). 0664 00-3