TM-9-2350-277-20-5 Unit Maintenance Manual Volume 5 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 127 of 928
TM 9-2350-277-20-5 REPLACE TUBE FROM RAMP CONTROL VALVE TO BULKHEAD 0664 00 THIS WORK PACKAGE COVERS: Removal (page 0664 00-1). Installation (page 0664 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0926 00, Item 65) M a t e r i a l s / P a r t s Locknut (3) P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) Ramp lowered (see your -10) Driver’s power plant access panel removed (see your -10) Left front floor plate removed (WP 0453 00) REMOVAL NOTE There are two types of ramp control valves. One has an internal relief valve and the other has an external relief valve. The tube on the ramp control valve with external relief valve is attached to a tee fitting. The tube on the ramp control valve with internal relief valve is attached to an elbow fitting. 1. Remove three locknuts (1), screws (2), washers (3), and clamps (4) from power plant compartment bulkhead. Discard locknuts. 2. Remove clamps (4) from tube (5). 0664 00-1