TM-9-2350-277-20-4 Unit Maintenance Manual Volume 4 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 84 of 884
TM 9--2350--277--20--4 0424 01--2 RE P L ACE T 150 T RACK S HO E PAD - Continued 0424 01 INSTALLATION 1. Install stud (4) of track shoe pad (1) through track shoe (2) from under track and install new locknut (3) on stud. 2. TIGHTEN LOCKNUT (3)TO 120 -150 LB -FT (162 -293 N∙m) TORQUE. FOLLOW--THROUGH STEPS 1. Unblock vehicle (see your-10). 2. Road test vehicle to check that track shoe pad is installed correct (see your-10). END OF TASK Change 2