TM-9-2350-277-20-4 Unit Maintenance Manual Volume 4 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 481 of 884

TM 9-2350-277-20-4 REPLACE RAMP LINKAGE (M1064A3 ONLY) 0528 00 THIS WORK PACKAGE COVERS: Removal (page 0528 00-1). Cleaning, Inspection, and Repair (page 0528 00-3). Installation (page 0528 00-3). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0926 00, Item 65) M a t e r i a l s / P a r t s Cotter pin (8) Key washer (8) Locknut Lockwasher (2) Square washer (2) P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine stopped (see your -10) Carrier blocked (see your -10) Ramp lowered (see your -10) Ammunition racks removed as needed (WP 0606 00) or (WP 0608 00) REMOVAL NOTE Removaland installation of ramp linkage is the same for both sides of carrier. Text is for one side only. 1. Remove cotter pin (1), headed pin (2), and connecting link (3) from arm (4). Discard cotter pin. 2. Remove cotter pin (5), headed pin (6), and connecting link (3) from clevis (7). Discard cotter pin. 0528 00-1