TM-9-2350-277-20-4 Unit Maintenance Manual Volume 4 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 258 of 884

TM 9-2350-277-20-4 RAISE AND LOWER POWER PLANT GRILLE — Continued 0464 00 C A U T I O N Of the 14 screws removed, one is the lifting eye screw and two are coarse threaded screws. Make sure the different screws are installed in their proper places. 6. Secure grill (1) to hull (2) with 14 screws (3) and washers (4). TIGHTEN LIFTING EYE SCREW TO 175-200 LB-FT (237-271 N m) TORQUE. TIGHTEN TWO COARSE THREADED SCREWS TO 151-166 LB-FT (205-225 N m) TORQUE. TIGHTEN 11 SCREWS TO 100-120 LB-FT (136-163 N m) TORQUE. 7. Secure power plant front access door (5) in open position with door brace (6). 8. Connect cannon plug of headlight wiring harness (7) to hull (8). 9. Connect auxiliary fluid detector (1) on auxiliary tank (2) to cable (3). 0464 00-14