TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 89 of 962

TM 9-2350-277-20-3 REPLACE UTILITY OUTLET RECEPTACLE Continued 0265 00 4. Install master switch panel (2) on distribution box (9) Secure with eight screws (10), washers (11), and new locknuts (12). 5. Connect circuit 37 lead (13) to utility receptacle lead (6). FOLLOW-THROUGH STEPS 1. Install warning light panel assembly (WP 0291 00). 2. Connect battery ground lead (WP 0337 00) or (WP 0338 00). 3. Turn MASTER SWITCH to ON (see your –10). 4. Check receptacle for electrical continuity. 5. Turn MASTER SWITCH to OFF (see your –10). END OF TASK 0265 00-3/4 blank Change 2