TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 777 of 962
TM 9-2350-277-20-3 REPLACE TRANSMISSION OIL SAMPLING VALVE AND PRESSURE SWITCH — Continued 0400 00 INSTALLATION 1. Install new preformed packing (8), new retainer (7), and tee (3) with tube nut (6) on transmission. 2. Apply sealing compound to male threads of switch (5), and install switch in tee (3). 3. Connect circuit 366 lead (4) to switch (5) 4. Apply sealing compound to male threads of bushing (2), and install bushing in tee (3). 5. Install valve (1) in bushing (2). FOLLOW-THROUGH STEPS 1. Close power plant access door (see your -10). 2. Raise trim vane (see your -10). END OF TASK 0400 00-3/4 blank