TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 74 of 962

TM 9-2350-277-20-3 REPLACE MASTER SWITCH PANEL ASSEMBLY (M577A3 AND M1068A3 ONLY) — Continued 0261 00 INSTALLATION 1. Install three new grommets (11) and circuits 28 (7), 29 (8), and 30 (9) leads in master switch panel (6). 2. Connect circuits 28 (7), 29 (8), and 30 (9) leads to fuel selector switch (10). 3. Install three new grommets (5) and circuits 37A (4), 38 (1), 38A (2) leads in master switch panel assembly (6). 4. Connect circuit 37A lead (4) to circuit breaker (12). 5. Connect circuits 38 (1), 38A (2) leads to dome light switch (3). 6. Connect utility outlet lead (13) to circuit 37 lead (14). 7. Install two new grommets (15), wiring harness (16), and circuit 59 lead (17) in master switch panel (6). 8. Connect wiring harness (16) to blower switch (18) and to circuit 37B lead on circuit breaker (19). 9. Connect circuit 59 lead (17) to blower switch (18). 0261 00-4