TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 613 of 962

TM 9-2350-277-20-3 INSTALLATION 1. Install sections of wiring harness (1) in carrier. 2. Secure hook (2) to bulkhead with screw (3), two washers (4), and new locknut (5). 3. Install cover (6) with chain (7) on wiring harness (1). 4. Install clamp (8) on wiring harness (1). Secure clamp to bulkhead with screw (9), two washers (10), and new locknut (11). 5. Secure circuit 7 lead (12) to bulkhead with screw (13), two washers (14), and new locknut (15). 0366 00-9 Change 2 REPLACE SMOKE GRENADE LAUNCHER WIRING HARNESS (M113A3, M1059A3, AND M58 ONLY) — Continued 0366 00