TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 510 of 962
TM 9-2350-277-20-3 37. Install circuit 451 lead (5) on weldnut. Secure with three screws (8), new lockwashers (9), and clamps (10). 38. Install clamp (11) on circuit 451 lead (5). Secure with screw (12) and nut (13). 39. Install clamp (11) on floor transverse beam (14). Secure with two screws (15) and nuts (16). 40. Install wiring harness (1) and bilge tube clamp (2) on weldnut (3). Secure with screw (4) and clamp (5) and new lockwasher (6). 0362 00-32 Change 2 0362 00 REPLACE REAR MAIN WIRING HARNESS (M113A3, M1059A3, AND M58) — Continued