TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 182 of 962
TM 9-2350-277-20-3 INSTALLATION 1. Install harness lead (16) through hole in top of distribution box (12). Secure harness lead and circuit 450A lead (15) to bus bar (17) with new lockwasher (14) and screw (13). 2. Install master switch panel (11) on distribution box (12). Secure with eight screws (10), washers (9), and new locknuts (8). 3. Connect circuit 27E lead (5) to battery generator gage (6). 4. Connect circuit 10 lead (3) to instrument panel circuit breaker (4). 5. Connect circuit 15 lead (1) to panel wiring harness (2). 0289 00-4 Change 2 REPLACE INSTRUMENT PANEL BATTERY-GENERATOR GAUGE WIRING HARNESS — Continued 0289 00