TM-9-2350-277-20-3 Unit Maintenance Manual Volume 3 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 115 of 962

TM 9-2350-277-20-3 0270 00 NOTE Do Step 10 and Step 11 for M113A3 carriers with water/ration heater kit installed only. 10. Connect lead 222A (1) to water/ration heater circuit breaker (2). 11. Install lead 222A (1) on bus bar (3) in distribution box (4). 12. Secure circuit lead 450C (5) to bus bar (3) in distribution box (4) with screw (6) and new lockwasher (7). 13. Install grommet (8) on circuit lead 2 (9) and grommet (10) on lead 2A (11). Route leads into distribution box (4) and install grommets in distribution box. 14. Install grommet (12) on circuit 27E, 10, and 15 lead (13). Route lead into distribution box (4) and install grommet in distribution box. 15. Secure circuit 27E, 10, and 15 lead (13) and lead 450A (14) to bus bar (3) with screw (15) and new lockwasher (16). NOTE Do Step 16 and Step 17 for M113A3 carriers with water/ration heater kit installed only. 16. Install grommet (17) on circuit lead 222B (18). Route lead into distribution box (4) and install grommet in distribution box. 17. Connect circuit lead 222B (18) to water/ ration circuit breaker (2) in distribution box (4). 0270 00-7 Change 2 REPAIR DISTRIBUTION BOX (M113A3, M1059A3, M1064A3, AND M58 ONLY) — Continued