TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 19 of 790

TM 9-2350-277-20-2 SERVICE UPON RECEIPT 0154 00 THIS WORK PACKAGE COVERS: This section contains information on how to check the M58, M113A3, M577A3, M1059A3, M1064A3, and M1068A3 carriers when received. INITIAL SETUP: M a i n t e n a n c e L e v e l Unit PRELIMINARY CHECKS AND ADJUSTMENTS CHECKING UNPACKED EQUIPMENT 1. Do the following steps to check carriers and parts upon receipt: a. Inspect the equipment for possible damage incurred during shipment. If the equipment has been damaged, report the damage on DD Form 6, Packaging Improvement Report. b. Check equipment against the packing slip and the BII in TM 9-2350-277-10 (All Carriers), to see if shipment is complete. Report all differences using the procedure given in DA Pamphlet 738-750. c. Check to see whether the equipment has been modified. See DA Form 2408–9, Transfer, Gain, and Loss Report. END OF TASK 0154 00-1/2 blank Change 2