TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 564 of 790
TM 9-2350-277-20-2 CLEAN RADIATOR — Continued 0228 00 12. Secure radiator access door (1) to radiator opening with two fasteners (2). 13. Secure radiator access panel (3) to power plant compartment bulklhead with two clamps (4) and bolts (5). FOLLOW-THROUGH STEPS 1. Install power plant bottom access cover (WP 0450 00). 2. Install driver’s power plant access panel (see your -10). 3. Install power plant rear access panel (see your -10). 4. Close power plant front access door (see your -10). 5. Raise trim vane (see your -10). END OF TASK 0228 00-4