TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 551 of 790
TM 9-2350-277-20-2 REPLACE LEFT/RIGHT TURBO EXHAUST PIPE HEAT SHIELD — Continued 0226 00 INSTALLATION 1. Wrap new insulation cover (1) around exhaust tube (2). 2. Cut new wire (3) to appropriate length and make two loops at the middle of length around capstan (4) on one half of insulation cover (1). 3. Pull wire ends (3) toward corresponding capstan (4) on other half of cover (1). Twist one wire around other to form a figure eight. 4. Cross ends of wire (3) behind second capstan (4). 5. Wind wire ends (3) to approximately 3/4 inch (19 mm) and cut off. 6. Bend wound ends back around capstan (4) hole. 7. Repeat Steps 4 - 7 to tie remaining sets of capstans (4) together. Check to make sure that seams are firmly pulled together. FOLLOW-THROUGH STEPS 1. Install driver’s compartment access panel, if necessary (see your -10). 2. Install air cleaner, if necessary (WP 0168 00). 3. Close power plant front access door (see your -10). 4. Raise trim vane (see your -10). END OF TASK 0226 00-3/4 blank