TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 53 of 790
TM 9-2350-277-20-2 PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING LUBRICATION INSTRUCTIONS — Continued 0155 00 Table 18. Semi-Annual Unit Level Preventive Maintenance Checks and Services for M113A3 FOV ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED C R E W M E M B E R PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 1 Semi- Annual Road Test C A U T I O N Do not allow engine to operate for prolonged periods if outside air temperature is less than 85 F (29 C) and gauge is above 200 F (93 C) or outside air temperature is above 85 F (29 C) and gauge is above 225 F (100 C). Serious damage to engine may result. NOTE Be sure that all operator level PMCS in your -10 have been completed prior to performing this PMCS. Any non-mission capable faults must be corrected prior to road test. NOTE Check instruments, gauges, and warning lights for normal indications as outlined in your -10. NOTE Review all operator recorded problems prior to road test. NOTE When conditions prevent a road test, perform engine idle test (Step 3a.) and governed no load test (Step 4a.). a. Start engine (see your -10). Perform a road test. Drive carrier at least 5 miles (8 km). Any Class III leak or damage that would prevent operation of the carrier. a Semi- Annual Left and Right Steering C A U T I O N Power plant can be damaged. Do not pivot steer when carrier is moving except in a track failure emergency. 0155 00-33 Change 3