TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 508 of 790
TM 9-2350-277-20-2 REPLACE FUEL CONTROL SHAFT AND LINKAGE — Continued 0217 00 INSTALLATION 1. Install pin (4) on lever (18). Secure with washer (17) and new cotter pin (16). 2. Install bearing (7) on shaft (8). Secure with washer (6) and new locknut (5). 3. Position bearing (12) on bulkhead. Secure with washer (14), new lockwasher (15) and screw (13). Do not tighten screw at this time. 4. Install shaft (8) with bearing (7) on bearing (12). Secure bearing (7) to bulkhead with washer (10), new lockwasher (11) and screw (9). 5. Position bearing (12) for free movement of shaft (8) and tighten screw (13) on bearing (8). 6. Install link (3) through pin (4) and secure with washer (2) and nut (1). Do not tighten nut at this time. 0217 00-4