TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 483 of 790
TM 9-2350-277-20-2 ADJUST THROTTLE VALVE (TV) MODULATOR 0213 00 THIS WORK PACKAGE COVERS: Adjustment (page 0213 00-1). Field Operational Test (page 0213 00-5). INITIAL SETUP: M a i n t e n a n c e L e v e l Unit T o o l s a n d S p e c i a l T o o l s General Mechanic’s Tool Kit (WP 0926 00, Item 65) Pressure Gauge Kit (WP 0926 00, Item 35) M a t e r i a l s / P a r t s Sealing compound (WP 0928 00, Item 56) P e r s o n n e l R e q u i r e d Unit Mechanic R e f e r e n c e s See your -10 E q u i p m e n t C o n d i t i o n Engine warm Parking brake set (see your -10) Engine stopped (see your -10) Carrier blocked (see your -10) Trim vane lowered (see your -10) Power plant front access door opened (see your -10) Driver’s power plant access panel removed (see your -10) ADJUSTMENT 1. Check to make sure throttle valve modulator lever (1) is in idle position. 2. Adjust two hex nuts (2) so cable modulator bracket (3) is located near mid-range of threaded portion of cable housing (4). Tighten nuts. 0213 00-1