TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 467 of 790

TM 9-2350-277-20-2 REPLACE AIR BOX IGNITION COIL — Continued 0208 00 INSTALLATION 1. Connect igniter lead (6) to air box ignition coil (2). 2. Connect lead (5) to air box ignition coil (2). 3. Install air box ignition coil (2) and pad (3) on bracket (4). Tighten screw (1). FOLLOW-THROUGH STEPS 1. Install power plant upper rear access panel (see your -10). END OF TASK 0208 00-3/4 blank