TM-9-2350-277-20-2 Unit Maintenance Manual Volume 2 M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 112 of 790
TM 9-2350-277-20-2 PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING LUBRICATION INSTRUCTIONS — Continued 0155 00 ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED C R E W M E M B E R PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 55 Semi- Annual Power Plant Mount a. Tighten loose mount screws (on forward engine mount) to 100-120 lb-ft (136–163 N m) torque. Use torque wrench (WP 0926 00, Item 85) and socket set (WP 0926 00, Item 71). Any cracked or broken nuts. MOUNT SCREWS MOUNT 0155 00-92 Change 3