TM-9-2350-277-10 Operator Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 665 of 868

TM 9-2350-277-10 BREAK/JOIN (T130) TRACK 0092 00 THIS WORK PACKAGE COVERS: Break Track (page 0092 00-1). Join Track (page 0092 00-6). INITIAL SETUP: M a i n t e n a n c e L e v e l Operator T o o l s a n d S p e c i a l T o o l s Crowbar (WP 0102 00, Item 13) Drive Pin Punch (WP 0102 00, Item 44) Grease Gun (WP 0102 00, Item 25) Hammer, 2 lb (WP 0102 00, Item 26) or Hammer, 4 lb Adjustable Wrench, 1-5/16 inch (WP 0102 00, Item 64) Socket Handle, 1/2 inch drive (WP 0102 00, Item 30) Socket, 11/16 inch (WP 0102 00, Item 49) Track Fixture (2) (WP 0102 00, Item 23) Industrial Goggles (WP 0103 00) P e r s o n n e l R e q u i r e d Driver Crew E q u i p m e n t C o n d i t i o n Engine stopped (WP 0024 00) BREAK (T130) TRACK 1. Unstow crowbar and track fixtures from rear top deck. Remove industrial goggles and hammer from tool bag. 2. START ENGINE (WP 0021 00). 3. Drive carrier to firm level ground. See task: DRIVE CARRIER (WP 0023 00). 0092 00-1 Change 2 (WP 0103 00)