TM-9-2350-277-10 Operator Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 463 of 868

TM 9-2350-277-10 TOWING TRAILER WITH CARRIER — Continued 0079 00 DISCONNECT TRAILER FROM CARRIER 1. STOP ENGINE. See WP 0024 00. 2. If connected, unplug trailer electrical connector from carrier trailer light receptacle. 3. Remove tow chains from shackles. 4. Remove shackles from towing eyes and stow in tool bag. 5. Remove chains from trailer and return to M200 series trailer. 0079 00-5 6. Install trailer's original tow chains. 7. Remove cotter pin. Pull up on pintle hook latch and open pintle. 8. Remove trailer draw bar from carrier tow pintle. 9. Close tow pintle. Check that tow pintle latches closed. Install cotter pin to secure latch. Change 3