TM-9-2350-277-10 Operator Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 393 of 868
TM 9-2350-277-10 SET UP COMMAND POST TENT (COVERED EXTENSION) (M577A3 ONLY) — Continued 0056 00 NOTE Two men are required on each side of frame to lift it into position on carrier. 7. Attach frame to carrier at two fittings. NOTE If you need protection against extreme cold weather, install tent liner. See task: INSTALL/ REMOVE TENT LINER FOR EXTREME COLD WEATHER (WP 0058 00). 8. Unroll tent cover along framework, and unfold sides and end. 9. Lift rear of frame assembly and insert both rear legs at the same time. 10. Install two center legs in frame assembly. 11. Adjust all four legs to contour of ground. 12. Loosen the three wingnuts securing clamping strips to hull at each side of ramp. 13. Insert beaded edge of cover under clamping strip. Tighten wingnuts. Two soldiers are required (one on top of carrier and one on ground). 0056 00-3