TM-9-2350-275-BD Battlefield Damage Assessment and Repair for M113 Family Download

Page 72 of 224

TM 9-2350-275-BD COOLING SYSTEM Procedural Steps (Cont): 8. Re-install fan tower belts. 9. Close engine compartment panels. 10. Record the BDAR action taken. When the mission is completed, as soon as practicable, repair the vehicle using standard maintenance procedures. 5-7. V-BELT, MISSING OR BROKEN General Information: Vehicle cooling and charging systems inoperable due to missing or broken V-belts. Limitations: None If rope or wire is used, check tension frequently Personnel/Time Required: 1 soldier 10 to 60 minutes Materials/Tools: Adjustable link belting Rope, 3/8 inch to 1/2 inch Communication wire Other Options For multibelt systems, use one belt from a comparable vehicle Procedural Steps: Option 1. Adjustable Link Belt. 1. Loosen belt adjustment to allow for smallest possible belt length. 2. Assemble belt links to obtain a belt length as close as possible to the original belt length. Care must be exercised that the belt be put on with the belt taper going in the direction of puny rotation. This prevents undue strain on the belt links. 3. Readjust belt tensioner. 5-5