TM-9-2350-261-PMC Preventative Maintenance Checks PMCS for M113A2 M577A2 M106A2 M125A2 M1059 Download

Page 2 of 12

1. * 2. *3. *4. * 5. NOTE While performing PMCS: Check all bolts. nuts, and screws for Iooseness breaks or missing. Check for broken welds Check electrical connections for cracked or broken wire, or loose connectors Check hoses and fluid lines for wear, damage, and leaks. For any special operation refer to TM 9-2350-261-10. When working in/around the carrier, follow all safety procedures. Checkmark each item where any fault is noted. Record all faults on DA Form 2404. Provide equipment readiness status to your immediate leader. Refer to TM 9-2350-261-10 for Weekly and Monthly PMCS. BEFORE OPERATION CHECKS CARRIER COMMANDER Check exterior above shroud for damaged or missing items. Ensure all items are properly secured. Check fixed fire extinguisher handle and seal. Check smoke grenade launcher (M113A2, M1059). Check for leaks, loose hull access and drain plugs. CAUTION Check all flexible air intake ducts. Do not operate carrier if damage exists. Check inside front power plant compartment for leaks and damage. a. Air intake duct (holes or tears) b. Fuel lines (leaks) c. Coolant hoses (leaks) d. Oil lines (leaks) 2 of 8