TM-9-2350-261-34 Direct and General Maintenance Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 726 of 788

TM 9-2350-261-34 INSTALL CHEMICAL AGENT AUTOMATIC ALARM MOUNTING KIT (M113A2 ONLY) — Continued 0098 00 10. Thread battery cable (1) through rear grommet (2) of junction box (3). 11. Connect circuit 6B POS lead (4) to rear terminal of circuit breaker (5). 12. Connect circuit 7B NEG lead (6) to terminal strip (7). 13. Thread alarm unit cable (8) through rear grommet (2) of junction box (3). 14. Connect 509B lead (9) to terminal strip (7). 15. Connect 509C lead (10) to terminal strip (7). 0098 00-4