TM-9-2350-261-34 Direct and General Maintenance Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 579 of 788

TM 9-2350-261-34 INSTALL ANCHOR KIT (M113A2 AND M1059 ONLY) — Continued 0073 00 13. Remove two anchors (12) from the cables and towlines of anchor kit. 14. Slide two anchors (12) into supports (7) and brackets (10) on left side of carrier. 15. Fasten two hooks (3) to anchors (12) and tighten wingnuts. 16. Place tarpaulin (1), four straps (2), and fid (3) on flat surface. 17. Place two cable assemblies, six towlines, six shackles, and fid on tarpaulin (1). 0073 00-7