TM-9-2350-261-34 Direct and General Maintenance Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 423 of 788

TM 9-2350-261-34 INSTALL ELECTRONIC EQUIPMENT HEATER KIT (M577A2 ONLY) — Continued 0058 00 42. Install clamp (17) on inlet hose (16). 43. Place fuel pump capacitor (18), fuel hose clamp (17), wiring harness clamp (19), and two washers (20) on hull weldnut (21). Secure with new screw (22). 44. Lubricate rubber to rubber mating surfaces with silicone compound. 45. Connect circuit 402A lead (23) to capacitor lead (24). 46. Install clamp (25) on inlet hose (16). 47. Place fuel hose clamp (25) and wiring harness clamp (26) on hull weldnut (27). Secure with screw (28). 0058 00-11