TM-9-2350-261-34 Direct and General Maintenance Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 262 of 788

TM 9-2350-261-34 REPLACE FRONT MAIN WIRING HARNESS — Continued 0032 00 17. Remove eight nuts (1), washers (2), and screws (3). Separate master switch panel assembly (4) from distribution box (5). 18. Remove circuit 2A lead (13) or (19) and circuit 2 lead (16) or (18) from master switch panel assembly (see your -20). NOTE The distribution boxes shown below are M113A2 configuration. Your distribution box may have leads not shown here. Remove and install those leads as needed to do Steps 19 - 22 below. 19. Remove screw (6), lockwasher (7), and circuit 6 lead (8) from bus bar (9). Remove circuit 6 lead and grommet (10) from distribution box (5). Discard grommet and lockwasher. 20. On 100 amp generator system, remove screw (11), lockwasher (12), and circuit 3 lead (13) from circuit breaker (14). Remove circuit 3 lead and grommet (15) from distribution box (5). Discard grommet and lockwasher. 21. On 100 amp generator system, remove circuit 2 lead (16) from master switch panel assembly (see your -20). Remove circuit 2 lead and grommet (17) from distribution box (5). Discard grommet. 22. On 200 amp generator system, remove circuit 2 lead (18) and circuit 2A lead (19) from master switch panel assembly (see your -20). Remove circuit 2 lead, circuit 2A lead, and two grommets (20) and (21) from distribution box (5). Discard grommets. 0032 00-4