TM-9-2350-261-34 Direct and General Maintenance Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 242 of 788
TM 9-2350-261-34 REPLACE INSTRUMENT PANEL GAUGES AND SWITCHES WIRING HARNESS — Continued 0028 00 11. Install ground lead (1) and new lockwashers (2) on upper support (3). 12. Install instrument panel (4) with two mounts (5) on support (3). Secure with two screws (6) and flat washers (7). 13. Install panel (4) on two struts (8). Secure with two new locknuts (9), mounts (10) and (11), flat washers (12), and screws (13). FOLLOW-THROUGH STEPS 1. Connect speedometer and tachometer cables to instrument panel gauges (see your -20). 2. Connect battery negative lead (see your -20). 3. Turn master switch ON (see your -20). 4. Drive carrier to check that panel gauges and lights operate properly (see your -10). 5. Stop/shutdown engine (see your -10). END OF TASK 0028 00-4