TM-9-2350-261-34 Direct and General Maintenance Manual M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 198 of 788
TM 9-2350-261-34 REPLACE ENGINE — Continued 0021 00 NOTE Lubricate rod end bearings before assembling. Use GAA grease (see your –20). 24. Apply thin coat of antiseize compound to clean threads of three screws (18) and (14). 25. Install bracket assembly (13) on power plant. Secure with two screws (18), new lockwashers (19), and nuts (20). TIGHTEN SCREWS TO 300-324 LB-IN (34-37 N·M) TORQUE. Use torque wrench and socket wrench set. 26. Install screw (14) and new lockwasher (17) in bottom hole of bracket assembly (13). TIGHTEN SCREW TO 264-288 LB-IN (30-33 N·M) TORQUE. Use torque wrench and socket wrench set. 27. Position inner transfer shaft (15) and outer transfer shaft (16) in bracket assembly (13). Secure with screw (12) and new locknut (11). Use cross-tip screwdriver. 28. Attach gauge (11) to governor (12) in adjusting position. Secure with two screws (13). Align hole in throttle arm (14) with hole in gauge. Secure throttle arm. 29. Remove two screws (13) and gauge (11) from governor (12). Install gauge in operating position on governor. Secure with two screws. 0021 00-24