TM-9-2350-261-20-4 Unit Maintenance Manual Volume 4 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 578 of 788

TM 9-2350-261-20-4 REPLACE M8 CHEMICAL ALARM DISTRIBUTION BOX (M113A2 ONLY) — Continued 0773 00 INSTALLATION 1. Place new grommet (1) on harness (2) and (3). Install grommet (1) and harness (2) and (3) in distribution box (4). 2. Pair up circuit leads 7B and 7C (5) and 509A and 509B (6) and 509C and 509D (7), and install on terminal board (8) as shown. 3. Install circuit lead 6B (9) on circuit breaker (10) terminal. Secure with screw (11) and new lockwasher (12). 5. Connect wiring harness (15) to distribution box (4). 0773 00-2 4. Install two mounting screws (13) and new lockwashers (14) on distribution box (4). TORQUE SCREWS TO 73-79 LB-IN (8-9 N·M). Use torque wrench and socket set.