TM-9-2350-261-20-3 Unit Maintenance Manual Volume 3 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 830 of 936

TM 9-2350-261-20-3 REPLACE PERSONNEL HEATER ASSEMBLY (M1064 ONLY) — Continued 0621 00 FOLLOW-THROUGH STEPS 1. Connect fuel hose to heater (WP 0609 00). 2. Install heater hose on plenum (WP 0617 00). 3. Open heater fuel shutoff valve (see your -10). 4. Install power plant rear access panel (WP 0433 00) 5. Connect battery ground strap (WP 0294 00). 6. Start heater (see your -10). For heater with P/N 5000–30178 (Model A20), see TM 9-2540-207-14&P. Check heater for proper operation. Turn heater off. 7. Raise and lock ramp (see your -10). 8. Stop/shutdown engine (see your -10). END OF TASK 0621 00-6