TM-9-2350-261-20-3 Unit Maintenance Manual Volume 3 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download
Page 801 of 936
TM 9-2350-261-20-3 REPAIR PERSONNEL HEATER CONTROL BOX — Continued 0614 00 5. Install circuit breaker (12) in control box (2). a. Install circuit breaker (12) in control box (2). Secure with four new lockwashers (17), two screws (16), ground lead (15), and two nuts (18). b. Install lead 17-D (19), lead 17-3 (11), and jumper 15-17 (20) on one terminal, and lead 16 (21) on other terminal of circuit breaker (12). Secure with two lockwashers (13) and screws (14). FOLLOW-THROUGH STEPS 1. Install heater control box (WP 0613 00). END OF TASK 0614 00-9/10 blank