TM-9-2350-261-20-3 Unit Maintenance Manual Volume 3 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 800 of 936

TM 9-2350-261-20-3 REPAIR PERSONNEL HEATER CONTROL BOX — Continued 0614 00 4. Install indicator light assembly (1) in control box (2). a. Install light assembly (1) in control box (2). Secure with lockwasher (3) and nut (4). b. Install bulb (5) and cap (6) in light assembly (1). c. Install lead 19-2 (7) on RUN-OFF-START switch (8). Secure with lockwasher (9) and screw (10). d. Install lead 17-3 (11) on circuit breaker (12). Secure with lockwasher (13) and screw (14). e. Install groun d lead (1 5) o n circuit breaker (12 ) m ou nting screw (1 6). Secure with two new lock washers (1 7) an d 0614 00-8 nut (18).