TM-9-2350-261-20-3 Unit Maintenance Manual Volume 3 M113A2 M577A2 M1064 M1068 M1059 M901A1 Download

Page 792 of 936

TM 9-2350-261-20-3 REPLACE PERSONNEL HEATER CONTROL BOX — Continued 0613 00 INSTALLATION 1. Place two new lockwashers (8) and control box case (6) on hull weldnuts (9). Secure with two screws (7). 2. Install heater control box (4) in case (6). Secure with two screws (5). 3. Connect heater wiring harness (3) to control box (4). 4. Connect circuit 400 lead (1) to control box lead (2). FOLLOW-THROUGH STEPS 1. Connect battery ground strap (WP 0294 00). 2. Start heater (see your -10). Check that control box works right. Turn heater off. END OF TASK 0613 00-2